Fabrication & Installation of Piping, Support, Steel Structure and LPG Tank Pump Column and Equipment Installation – South Pars Phases 9 & 10 |
|
Client: |
Panahsaz Iran Engineering Co. |
Start Date: |
Dec, 2007 |
Status: |
Completion of the project |
Work Volume: |
Fabrication and Installation 48000 ID Piping + Fabrication and Installation 35000 kg Support + Fabrication and Installation 150000 kg Steel Structure + 96000 kg Rotary ,Fixed Equipment Installation + Fabrication and Installation of LPG Tanks Pump Column |
Contract Total Amount: |
|
Description: |
Fabrication & Installation of Piping and Support, Test Package Preparation ,Line Check ,Hydro test, Flushing ,Reinstatement ,Fabrication and Installation of Steel Structure, Rotary &FixedEquipment Installation, Fabrication and Installation of LPG Tanks Pump Column from Start to Pre-Commissioning |
projects

Fabrication & Installation of Piping, Support, Steel Structure and LPG Tank Pump Column and Equipment Installation – South Pars Phases 9 & 10
- یکشنبه, خرداد 21 1402
- vistaweb
- برای نظر دادن اولین باش!
نظر دادن
از پر شدن تمامی موارد الزامی ستارهدار (*) اطمینان حاصل کنید. کد HTML مجاز نیست.