Fabrication & Installation of Piping, Support, Steel Structure and LPG Tank Pump Column – South Pars Phases 15 & 16

projects

Fabrication & Installation of Piping, Support, Steel Structure and LPG Tank Pump Column – South Pars Phases 15 & 16

Fabrication & Installation of Piping, Support, Steel Structure and LPG Tank Pump Column – South Pars Phases 15 & 16

Client:

Panahsaz Iran Engineering Co.

Start Date:

Jan, 2010

Status:

Completion of the project

Work Volume:

Fabrication and Installation 90000 ID Piping + Fabrication and Installation 45000 kg Support + Fabrication and Installation 173000 kg Steel Structure + Fabrication and Installation of LPG Tanks Pump Column

Contract Total Amount:

36 Billion Rials

Description:

Fabrication &Installation of Piping and Support, Test Package Preparation ,Line Check ,Hydro test, Flushing ,Reinstatement ,Fabrication and Installation of Steel Structure, Fabrication and Installation of LPG Tanks Pump Column from Start to Pre-Commissioning

 

بازدید 1274 بار آخرین ویرایش در چهارشنبه, 30 دی 1394 ساعت 01:42

نظر دادن

از پر شدن تمامی موارد الزامی ستاره‌دار (*) اطمینان حاصل کنید. کد HTML مجاز نیست.

شرکت ساتراپ کشت و صنعت پارسیان

زمینه فعالیت :تولید و توزیع کشاورزی -باغداری -گلخانه-زنبورداری-پرورش و تکثیر انواع طیور و آبزیان-کشت گیاهان دارویی-کشت انواع حبوبات و دانه ها-پرورش احشام و انواع و اقسام چهارپایان-صنایع بسته بندی-ساخت و تولید قطعات صنعتی کشاورزی-صادرات و واردات کلیه کالاهای مجاز بازرگانی

 

دسترسی سریع

آماربازدیدازسایت ما

امروز 0

دیروز 4

این هفته 4

این ماه 16

کل بازدید 9403

اطلاعات تماس

 دفتر بوشهر: 07737363878

 دفترتهران:88842604 (021)

 دفترشهرکرد: 03832278902

ایمیل: این آدرس ایمیل توسط spambots حفاظت می شود. برای دیدن شما نیاز به جاوا اسکریپت دارید

Top